My new Project
On 14th of May 2010 I was released from Tesco Project as the requirements were getting trimmed and there were requirement for ATG resources in Direct Wines Project. So I was moved into Direct Wines before getting released from Tesco completely. I thought that Friday was going to be the longest day in my life but I never knew that all the coming days will be equally long. I went to tumkur after attending a meeting with the new team. I came back on Tuesday and when I was entering the campus I got a call from my new PM asking about my where-about and told me to shift my pc to 5th floor within an hour. I was confused looking at the pace with which I was being utilized. That was just the beginning and from the day one I am staying in office for more than 12 hours. Today is Sunday and I am in office at 21:04. I can now say I have become busy and finding it difficult to manage time. I was really scolding everybody who was telling that he is busy with work, 24hrs is less, time management is difficult and stuff like that. But today I am in a situation wherein I am not finding much time for myself. Today I had left the office 1hr back but one person from team called me back to office since the code is not working in Build machine. I don’t know why the bloody hell did the code work in my system and is not working anywhere else. This code is not written by me to comment anything. Now at 22:00 some demo is there and I have to be there in case if the code doesn’t run in build machine so that they can execute in my system. I thought of giving my credentials to them so that they can use my system at any point of time they want in my absence but there are lot of personal things in my machine so can’t just give my credentials to them. I really don’t know whether this much time I am spending in office will help my career or is it just a waste of time.
Comments